{
  "id": "dgm_LAPKC82HaCNx",
  "from": 1,
  "to": 2,
  "added": [
    "shift",
    "errOk",
    "full",
    "e9",
    "e10",
    "e11",
    "e13"
  ],
  "changed": [
    "done",
    "rollback",
    "notify",
    "failed",
    "e7",
    "e12"
  ],
  "removed": [
    "prod"
  ],
  "scene": [],
  "scenario": "Pull request 218 replaces the straight deploy to production with a canary rollout. Seven elements are new: the step that shifts 10% more traffic, its two checks, the error rate and whether all traffic has moved, and their four edges, the loop back to the shift among them. Two edges changed and kept their IDs: e7, the smoke tests' yes exit, now leads to the canary's first step, and e12, the edge into Deployed, now leaves the last check on its yes exit. The production deploy is removed. The compare also lists the steps the engine moved to make room for the canary. Reviewers see this list and both revisions on the pull request before the new workflow first runs."
}
